4.12 Dual Fuel System (Gas Engine Only).4.9 Oscillating Axle Lockout Test (If Equipped).4.2 Boom Operating Characteristics and Limitations.From the Ground Control Station with No Load in the Platform:. ![]() 2.2 Preparation, Inspection, and Maintenance.USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION It contains additional details and templates. Firefighters and other rescue professionals are trained in technical rescue, but their response time and the equipment they use may not be the best option to meet OSHA requirements for prompt rescue after a fall arrest and should be considered to be a last resort.Īs you begin to think through and build your company’s rescue plan, take a moment to download the Genie Safe Use Plan Guidance document. In the event a technical rescue by emergency personnel is required, rescue procedures must account for the reasons why the platform may be stranded at height and any need for prompt action. Please note that any of these rescues should only be carried out by appropriately trained personnel. The straps contained in a case allow the operator to stand up in their harness to relieve the pressure being applied to arteries and veins until they can be rescued. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |